Project

Meadowbank Lift Openings

Fire-Rated Caulking & Joint Sealing | Meadowbank, NSW

Client

Kleemann Elevators Australia

Location

2–20 Railway Parade, Meadowbank NSW

Project Value

$25,000
Kleemann Elevators Australia

Project Overview

Fire-Rated Sealing to 39 Lift Openings

AusCaulking delivered specialist fire caulking and fire-rated sealing to 39 lift openings throughout the Meadowbank development.

The package involved detailed perimeter sealing around lift door frames, with each joint forming part of the broader fire-rated construction system rather than simply providing a finished edge.

The project demonstrates AusCaulking’s ability to deliver specialist commercial caulking packages for lift contractors and construction teams where technical detailing, compliance and repeatable workmanship are critical.

Kleemann Elevators

Our Scope of Works

The lift door frames measured approximately 1140mm x 2400mm, with joint widths reaching up to 30mm.

Our scope included:

Joint Preparation

Backing Rod Installation

Application of Sika Primer-3 N

Installation of Sikaflex®-400 Fire

Completion of 39 lift openings across the development

The works required each joint to be built up correctly from the substrate out, ensuring the finished seal had the right depth, adhesion and profile.

Products & Materials

Products used included:

01 Sikaflex®-400 Fire

02 Backing Rod

03 Backing rod

Sika Primer-3 N was used to promote reliable adhesion between the sealant and suitable surrounding substrates. Backing rod controlled joint depth and helped form the correct sealant profile. Sikaflex-400 Fire provided the fire-rated sealing component.

A fire-rated joint is only as strong as the system behind it. The sealant may be the visible finish, but its performance depends on correct preparation, primer, backing rod and installation working together.

Around lift openings, this is particularly important because gaps in fire-rated construction need to be sealed in a way that supports the intended compartmentation performance of the surrounding assembly.

The Detail

Repetition and Consistency Across 39 Openings

The main challenge was repetition at scale.

Completing one technically correct joint is one thing; delivering the same standard across 39 individual lift openings, including joints up to 30mm wide, requires discipline and consistency.

The works also had to remain coordinated with the lift installation program so each opening could be completed at the right stage without disrupting progress on site.

Fire-Rated Lift Caulking

Why This Project Matters

This project shows the difference between basic caulking and specialist fire-rated joint sealing.

For AusCaulking, it demonstrates the ability to deliver a complete fire-sealing system across a substantial lift package, where preparation, product compatibility and installation quality all contribute to the final result.

For builders and lift contractors, that means working with joint sealing contractors who understand that performance starts long before the sealant is tooled off.