Project

Yennora Multi Gate Facility

Cool Room, Internal & Specialist Commercial Sealing | Yennora, NSW

Client

Orwell Construction

Location

28 Nelson Road, Yennora NSW 2161

Project Value

To be confirmed
orwell multigate yennora industrial facility render australian caulking

Project Overview

A Staged Package Spanning Cool Rooms Through to Architectural Finishes

AusCaulking delivered a staged commercial caulking package at Orwell’s Yennora project, beginning with specialist sealing to cool room areas before expanding into windows, cladding interfaces, bathrooms, offices and detailed internal finishes.

The broader development includes a large production facility with insulated sandwich panels, internal finishes and advanced cleanroom environments for medical-device manufacturing.

orwell multigate yennora ceiling column junction australian caulking

Our Scope of Works

Works across the project included:

Caulking to cool room panels and junctions

Window frame sealing

Small cladding joints

Bathrooms and office areas

Ceiling and curved ceiling junctions

Ceiling and curved ceiling junctions

Column sealing

Door perimeters

Bathroom vanity junctions

Balcony and architectural interfaces

Fire-rated sealing to nominated joints

General internal finishing as the project progressed

Access varied throughout the works, with EWP certification required for parts of the scope and ladders used for later ceiling and elevated areas.

Products & Materials

Products used throughout the different stages included:

01 DOWSIL™ 680

02 DOWSIL™ 798

03 Antas SK75 Products

04 Antas MS30 White

05 Sikaflex®-400 Fire

06 H.B. Fuller Firesound

07 Pasco Products

08 Backing rod where required

The variety of products reflected the different demands across the project — from architectural finishes through to fire-rated applications and insulated panel systems.

The Detail

The Diversity of the Package

The defining challenge was the diversity of the package.

Cool room caulking required continuous sealing across panel systems, while later stages introduced windows, cladding, ceilings, bathrooms and fire-rated joints — each with different access, product and finish requirements.

The works were also completed progressively, so labour, materials and access equipment had to remain aligned with the broader construction program.

Outcome

AusCaulking delivered a multi-stage sealing package across specialist and architectural areas of the Yennora facility.

The result was a consistent approach across cool rooms, internal finishes, windows, cladding and fire-rated applications as the project moved through different stages of construction.

yennora locker room amenities

Why This Project Matters

This project is significant because the sealing work formed part of a highly controlled industrial production environment rather than a conventional office or warehouse fitout.

At Yennora, the caulking package had to support a facility incorporating insulated panel systems, specialist internal finishes and cleanroom environments where continuity, cleanliness and accurate sealing are part of the building’s overall performance.

For AusCaulking, the value of the project lies in showing that our work can move comfortably between architectural finishing and technically demanding industrial areas — including cool rooms, cleanroom-adjacent spaces and fire-rated applications — within the same build.

Additional Notes

The project is particularly relevant to clients delivering industrial, production, cool room and controlled-environment facilities where multiple sealing systems need to work together across the same development.